High Efficiency Water Glycol Chiller, Flintshire
ICE have just completed the supply, installation and commissioning of a 121kw water glycol chiller in Flintshire. The Chiller manufactured by ICS, had an EER (energy efficiency rating) of 4.54, meaning our client was eligible to claim under the ECA scheme. The ECA scheme is a Government incentive scheme to encourage businesses to adopt highly energy […]
read more117kw Water/Glycol Chiller, North Wales
ICE have just supplied, installed and commissioned a new water/glycol chiller at a site in North Wales. The new water/glycol chiller is from the I Chiller range and is capable of 117kw of cooling at the specified conditions. The system provides a chilled water/glycol mix at 3°C to various process cooling skids around the site. […]
read moreNational HVAC Maintenance Contract
ICE have been awarded a national maintenance contract looking after the HVAC requirements for over 20 sites. Our client an international pharmaceutical distributor has instructed ICE to carry out pre-planned maintenance visits, reactive call out response and ongoing repairs to all heating, ventilation, air conditioning and refrigeration equipment, as well as providing replacement services for capital plant where […]
read moreR22 Replacement Project, North Wales
By the end of 2014, it became illegal to use R22 refrigerant to service refrigeration and air conditioning equipment. Due to this legislation our client, a pharmaceutical manufacturing company decided to take action. ICE were tasked with surveying the site and coming up with a solution for replacing all the R22 equipment across the site in North […]
read moreFreezer Installation, Runcorn
ICE have just completed the design, supply, installation and commissioning of a refrigeration system to serve a Freezer Room at a site in Runcorn. Our client was experiencing issues with their product not being frozen in the required time. ICE conducted a site survey and discovered the equipment serving the room wasn’t suffice. The new […]
read morePackaged Water Chiller Serving a Commercial Flatbed Printer in Kent.
ICE have recently completed the supply, installation and commissioning of a packaged water chiller for an Inca Onset S40i Printer in Gillingham, Kent. We were able to provide equipment to fit the printer’s cooling specification at an extremely competitive price, against an extremely short timescale. The packaged water chiller was up and running almost as […]
read moreWater Chiller and Associated Chilled Water Pipework, Liverpool
April 2013 – ICE have just completed the design, supply, installation and commissioning of a water chiller and associated chilled water pipework.The water chiller is located externally providing chilled water at 10°C to new process machinery around 40 metres away on the factory floor. The chilled water circuit consists of all valves, strainers, service points, insulation, trace heating and an aluminium weather proof cladding. […]
read moreProcess Water Chiller and Hydraulic Circuit
ICE have designed, supplied and commissioned a 63kw Daikin water chiller and hydraulic circuit, to provide chilled water to 12 process lines. Each process line has been supplied with a valve station allowing a regulated flow to each process. Our client an international plastics company moved to larger premises and chose ICE to carry out […]
read moreFreeze Drier Maintenance Contract
ICE have been awarded the Service and Maintenance Contract of two Freeze Drying Plants at a large pharmaceutical company in Wales. Both refrigeration plants and vacuum pumps are now under the care of ICE, who offer a 4 hour response to breakdowns of the plants, which is impressive as the site is a two hour […]
read moreBlast Freezer Installation and Freezer Extension
In April 2012, ICE completed the installation of a Blast Freezer system, at a large distribution centre of a major supermarket. Also included within the project was the installation of new evaporator coolers to existing low temperature refrigeration packs, to provide additional capacity to extended cold stores. The project took around 4 months to complete and […]
read more