Sales: 01928 56 88 00

sales@ice-ltd.co.uk

  • Home
  • About Us
  • Refrigeration
    • Cold Rooms
    • Refrigeration Maintenance Contracts
    • Process Cooling
    • Glycol and Water Chillers
    • R404A Replacement
    • R22 Replacement
    • F Gas Compliance Package
    • Dry Coolers
    • Remanufactured Refrigerator Compressors and Overhauls
    • Cellar Cooling Systems
    • Finance and Leasing Solutions
  • Air Conditioning
    • Finance
    • Installation
    • Maintenance Contracts
    • Energy Assessments
    • R22 Replacement
    • F Gas Compliance Package
    • Portable Air Conditioning Hire
    • Domestic Air Conditioning
    • Evaporative Cooling Systems
  • Service and Repairs
  • Ventilation
    • Ventilation
    • Heat Recovery Ventilation Systems
  • Markets
  • Contact
    • Careers
  • Privacy
You are here: Home \ Latest News \ Gaming Company, Manchester

Gaming Company, Manchester

On October 18th, 2012, posted in: Latest News, Recent Airconditioning Projects by nick

In September 2012, ICE completed the air conditioning and ventilation works at the new premises of a gaming company in Manchester. The project consisted of the installation and commissioning of over 30 new Mitsubishi Electric air conditioning systems and the relocation of existing cassette units with the building. ICE also carried out various ventilation works including a new extraction system for the toilets

ICE have since been awarded the maintenance contract to look after two sites for this client.

Comments are closed.

Blog Categories

  • Latest News
  • Recent Airconditioning Projects
  • Recent Refrigeration Projects
  • Uncategorized
Copyright © 2018 ICE Ltd